Division,Section,Subsection,Division Title,Link,Includes,May Include,Does Not Include,Level 4 Numbering Recommendation,Alternate Terms/Abbreviations,See,See Also 00 00 00,,,Procurement and Contracting Requirements,numbersandtitles.aspx?id=b1050492-bed5-ea11-80f3-000d3a04ff75,,,,,,, ,,00 01 01,Project Title Page,numbersandtitles.aspx?id=b2050492-bed5-ea11-80f3-000d3a04ff75,project name and other general information.,,,,,, ,,00 01 03,Project Directory,numbersandtitles.aspx?id=b4050492-bed5-ea11-80f3-000d3a04ff75,documents to identify team members and their contact information.,,,,,, ,,00 01 05,Certifications Page,numbersandtitles.aspx?id=b6050492-bed5-ea11-80f3-000d3a04ff75,professional certifications by design professionals and others responsible for preparing construction documents.,,,,,, ,,00 01 07,Seals Page,numbersandtitles.aspx?id=b8050492-bed5-ea11-80f3-000d3a04ff75,professional seals by design professionals and others responsible for preparing construction documents.,,,,,, ,,00 01 10,Table of Contents,numbersandtitles.aspx?id=ba050492-bed5-ea11-80f3-000d3a04ff75,list of components of the project manual.,,,,,, ,,00 01 15,List of Drawing Sheets,numbersandtitles.aspx?id=bc050492-bed5-ea11-80f3-000d3a04ff75,list of graphic documents bound separately from the project manual.,,drawings bound into the project manual.,,,, ,,00 01 20,List of Schedules,numbersandtitles.aspx?id=bf050492-bed5-ea11-80f3-000d3a04ff75,list of schedules bound separately from the project manual.,,schedules bound into the project manual. Schedules which apply to only one section are included in the appropriate section. Schedules which apply to multiple sections in a division are included at XX 06 00 at the beginning of each division.,,,, ,00 10 00,,Solicitation,numbersandtitles.aspx?id=c2050492-bed5-ea11-80f3-000d3a04ff75,,,,,,, ,00 11 00,,Advertisements and Invitations,numbersandtitles.aspx?id=c3050492-bed5-ea11-80f3-000d3a04ff75,project information to attract qualified bidders or proposers.,,,,"bid: offer, tender (Canadian term).",00 20 00 for instructions for procurement. 00 24 00 for procurement scopes. 00 54 13 for supplementary scope statement. 01 11 00 for summary of work. 01 12 00 for multiple contract summary., ,,00 11 13,Advertisement for Bids,numbersandtitles.aspx?id=cb050492-bed5-ea11-80f3-000d3a04ff75,,,,,,, ,,00 11 15,Advertisement for Prequalification of Bidders,numbersandtitles.aspx?id=cc050492-bed5-ea11-80f3-000d3a04ff75,"notices to prospective bidders, project information, submittal procedures for prospective bidders qualifications, consistent with regional AIA/AGC Joint Cooperative Committees, prequalification conference, qualification documentation, prequalification notifications.",,,,,, ,,00 11 16,Invitation to Bid,numbersandtitles.aspx?id=ce050492-bed5-ea11-80f3-000d3a04ff75,,,,,,, ,,00 11 19,Request for Proposal,numbersandtitles.aspx?id=cf050492-bed5-ea11-80f3-000d3a04ff75,,,,,,, ,,00 11 53,Request for Qualifications,numbersandtitles.aspx?id=d0050492-bed5-ea11-80f3-000d3a04ff75,,,,,,, ,00 20 00,,Instructions for Procurement,numbersandtitles.aspx?id=d1050492-bed5-ea11-80f3-000d3a04ff75,,,,,,, ,00 21 00,,Instructions,numbersandtitles.aspx?id=d2050492-bed5-ea11-80f3-000d3a04ff75,conditions affecting award of contract and procedures with which bidders and proposers must comply.,,,,,, ,00 22 00,,Supplementary Instructions,numbersandtitles.aspx?id=d6050492-bed5-ea11-80f3-000d3a04ff75,project-specific requirements as supplements to published instructions documents.,,,,,00 26 00 for procurement substitution procedures. 00 31 00 for available project information. 01 25 00 for substitution procedures. 01 62 00 for product options., ,00 23 00,,Procurement Definitions,numbersandtitles.aspx?id=de050492-bed5-ea11-80f3-000d3a04ff75,definitions for terms used in procurement documents.,,,,,00 71 00 for contracting definitions. 01 42 16 for definitions., ,00 24 00,,Procurement Scopes,numbersandtitles.aspx?id=e2050492-bed5-ea11-80f3-000d3a04ff75,"descriptions to establish the content of a bid or proposal, if construction will be delivered under more than one construction contract, including multiple prime contracts with the owner.","allowance amounts and descriptions, alternate bid descriptions, and unit price item descriptions.",,,,00 43 21 for procurement allowance form. 00 43 22 for procurement unit price form.,00 43 23 for procurement alternate form. 00 54 13 for agreement form supplementary scope statement. 01 12 00 for multiple contract summary. 01 21 00 for allowances. 01 22 00 for unit prices. 01 23 00 for alternates. ,,00 24 13,Scopes of Bids,numbersandtitles.aspx?id=ed050492-bed5-ea11-80f3-000d3a04ff75,,,,,,, ,,00 24 16,Scopes of Proposals,numbersandtitles.aspx?id=f0050492-bed5-ea11-80f3-000d3a04ff75,,,,,,, ,00 25 00,,Procurement Meetings,numbersandtitles.aspx?id=f3050492-bed5-ea11-80f3-000d3a04ff75,requirements for meetings during the procurement stage.,,,,pre-bid meeting: pre-bid conference.,01 31 19 for project meetings., ,,00 25 13,Pre-Bid Meetings,numbersandtitles.aspx?id=f7050492-bed5-ea11-80f3-000d3a04ff75,,,,,,, ,,00 25 16,Pre-Proposal Meetings,numbersandtitles.aspx?id=f8050492-bed5-ea11-80f3-000d3a04ff75,,,,,,, ,00 26 00,,Procurement Substitution Procedures,numbersandtitles.aspx?id=f9050492-bed5-ea11-80f3-000d3a04ff75,requirements and procedures for consideration of proposals for substitution during the procurement stage. Substitution procedures applicable during both procurement and construction stages should be included in 01 25 00 substitution procedures.,,,,accepted substitution: approved equal.,00 43 25 for substitution request form (during procurement). 00 63 25 for substitution request form (during construction). 01 25 00 for substitution procedures during construction. 01 62 00 for product options., ,00 30 00,,Available Information,numbersandtitles.aspx?id=00060492-bed5-ea11-80f3-000d3a04ff75,,,,,,, ,00 31 00,,Available Project Information,numbersandtitles.aspx?id=01060492-bed5-ea11-80f3-000d3a04ff75,"information that is made available to bidders, proposers, or contractors but that is not normally intended to be included in the contract documents.",,,,information available to bidders.,, ,,00 31 13,Preliminary Schedules,,,,,,,, ,,00 31 16,Project Budget Information,,,,,,,, ,,00 31 19,Existing Condition Information,,,,,,,, ,,00 31 21,Survey Information,,,,,,,, ,,00 31 24,Environmental Assessment Information,,,,,,,, ,,00 31 25,Existing Material Information,,,,,,,, ,,00 31 26,Existing Hazardous Material Information,,,,,,,, ,,00 31 31,Geophysical Data,,,,,,,, ,,00 31 32,Geotechnical Data,,,,,,,, ,,00 31 43,Permit Application,,,,,,,, ,,00 31 46,Permits,,,,,,,, ,00 40 00,,Procurement Forms and Supplements,,,,,,,, ,00 50 00,,Contracting Forms and Supplements,,,,,,,, ,00 60 00,,Project Forms,,,,,,,, ,00 70 00,,Conditions of the Contract,,,,,,,, ,00 90 00,,"Revisions, Clarifications, and Modifications",,,,,,,, 01 00 00,,,General Requirements,numbersandtitles.aspx?id=a0070492-bed5-ea11-80f3-000d3a04ff75,,,,,,, 02 00 00,,,Existing Conditions,numbersandtitles.aspx?id=c6090492-bed5-ea11-80f3-000d3a04ff75,,,,,,, 03 00 00,,,Concrete,numbersandtitles.aspx?id=a60b0492-bed5-ea11-80f3-000d3a04ff75,,,,,,, 04 00 00,,,Masonry,numbersandtitles.aspx?id=300d0492-bed5-ea11-80f3-000d3a04ff75,,,,,,, 05 00 00,,,Metals,numbersandtitles.aspx?id=3a0e0492-bed5-ea11-80f3-000d3a04ff75,,,,,,, 06 00 00,,,"Wood, Plastics, and Composites",numbersandtitles.aspx?id=850f0492-bed5-ea11-80f3-000d3a04ff75,,,,,,, 07 00 00,,,Thermal and Moisture Protection,numbersandtitles.aspx?id=01110492-bed5-ea11-80f3-000d3a04ff75,,,,,,, 08 00 00,,,Openings,numbersandtitles.aspx?id=66130492-bed5-ea11-80f3-000d3a04ff75,,,,,,, 09 00 00,,,Finishes,numbersandtitles.aspx?id=e565fc97-bed5-ea11-80f3-000d3a04ff75,,,,,,, 10 00 00,,,Specialties,numbersandtitles.aspx?id=bf68fc97-bed5-ea11-80f3-000d3a04ff75,,,,,,, 11 00 00,,,Equipment,numbersandtitles.aspx?id=e96afc97-bed5-ea11-80f3-000d3a04ff75,,,,,,, 12 00 00,,,Furnishings,numbersandtitles.aspx?id=6d6dfc97-bed5-ea11-80f3-000d3a04ff75,,,,,,, 13 00 00,,,Special Construction,numbersandtitles.aspx?id=516ffc97-bed5-ea11-80f3-000d3a04ff75,,,,,,, 14 00 00,,,Conveying Equipment,numbersandtitles.aspx?id=be70fc97-bed5-ea11-80f3-000d3a04ff75,,,,,,, 21 00 00,,,Fire Suppression,numbersandtitles.aspx?id=e6d2f49d-bed5-ea11-80f3-000d3a04ff75,,,,,,, 22 00 00,,,Plumbing,numbersandtitles.aspx?id=97d3f49d-bed5-ea11-80f3-000d3a04ff75,,,,,,, 23 00 00,,,"Heating, Ventilating, and Air Conditioning (HVAC)",numbersandtitles.aspx?id=96d5f49d-bed5-ea11-80f3-000d3a04ff75,,,,,,, 25 00 00,,,Integrated Automation,numbersandtitles.aspx?id=80d8f49d-bed5-ea11-80f3-000d3a04ff75,,,,,,, 26 00 00,,,Electrical,numbersandtitles.aspx?id=37d9f49d-bed5-ea11-80f3-000d3a04ff75,,,,,,, 27 00 00,,,Communications,numbersandtitles.aspx?id=e1daf49d-bed5-ea11-80f3-000d3a04ff75,,,,,,, 28 00 00,,,Electronic Safety and Security,numbersandtitles.aspx?id=58dcf49d-bed5-ea11-80f3-000d3a04ff75,,,,,,, 31 00 00,,,Earthwork,numbersandtitles.aspx?id=4fdff49d-bed5-ea11-80f3-000d3a04ff75,,,,,,, 32 00 00,,,Exterior Improvements,numbersandtitles.aspx?id=1f32eda3-bed5-ea11-80f3-000d3a04ff75,,,,,,, 33 00 00,,,Utilities,numbersandtitles.aspx?id=1d34eda3-bed5-ea11-80f3-000d3a04ff75,,,,,,, 34 00 00,,,Transportation,numbersandtitles.aspx?id=9238eda3-bed5-ea11-80f3-000d3a04ff75,,,,,,, 35 00 00,,,Waterway and Marine Construction,numbersandtitles.aspx?id=133aeda3-bed5-ea11-80f3-000d3a04ff75,,,,,,, 40 00 00,,,Process Interconnections,numbersandtitles.aspx?id=7a3beda3-bed5-ea11-80f3-000d3a04ff75,,,,,,, 41 00 00,,,Material Processing and Handling Equipment,numbersandtitles.aspx?id=5f3eeda3-bed5-ea11-80f3-000d3a04ff75,,,,,,, 42 00 00,,,"Process Heating, Cooling, and Drying Equipment",numbersandtitles.aspx?id=38cfe5a9-bed5-ea11-80f3-000d3a04ff75,,,,,,, 43 00 00,,,"Process Gas and Liquid Handling, Purification, and Storage Equipment",numbersandtitles.aspx?id=c5cfe5a9-bed5-ea11-80f3-000d3a04ff75,,,,,,, 44 00 00,,,Pollution and Waste Control Equipment,numbersandtitles.aspx?id=e7d1e5a9-bed5-ea11-80f3-000d3a04ff75,,,,,,, 45 00 00,,,Industry-Specific Manufacturing Equipment,numbersandtitles.aspx?id=65d3e5a9-bed5-ea11-80f3-000d3a04ff75,,,,,,, 46 00 00,,,Water and Wastewater Equipment,numbersandtitles.aspx?id=ebd3e5a9-bed5-ea11-80f3-000d3a04ff75,,,,,,, 48 00 00,,,Electrical Power Generation,numbersandtitles.aspx?id=b4d5e5a9-bed5-ea11-80f3-000d3a04ff75,,,,,,,